top of page

What is a Market?

BMC Market, Borivali

The studio focuses on the question, ‘What is a market?’.  We undertook genealogical studies of key shifts in the structures of markets and their resultant typologies

Site Demarcation

ba7159_abd479a391a0491caceddeaae93b9d4c~mv2.png

Case Study

Salt Lake City Centre

Case study diagram-2.png
Case study diagram-3.png

All case study documentation can be found here.

Site Transactions

gifmaker_me.gif
vegetable market cross section-Model.jpg
center market cross section.jpg
gifmaker_me.gif
iso full site model details (1).jpg

Focused Group Discussions

Screenshot 2023-08-21 020133.png
Screenshot 2023-08-21 020145.png

All discussions can be found here.

drawing 1 density 3.png

The density of stakeholders at different time.

gifmaker_me (2).gif

Diagram representing different stakeholders mobility throughout the day on site showing less density inside the BMC market.

Problems identified

WhatsApp Image 2023-09-14 at 9.49.46 AM.png
WhatsApp Image 2023-09-14 at 9.49.47 AM.png
dia 1.png

the retail shops acting as a hard edge, separating the inside and outside market

dia 3.png

lack of proper ventilation and natural light

pdf 11_page-0001.png

Limited access ways leading to the inside market

Program list

Courtyard

Interactive Spaces

Specified Walkways

Stilt Bazaar

Stakeholders

Vendors

Buyers

Shop Owners

Auto drivers.

Conceptual models

iteration 8.png
iteration 6.png
iteration 7.png

Playing with the grid and removed the walls that were creating a hard edge.

iteration 3.png
iteration 1.png
iteration 2.png

Columns extending from the wall for ventilation and roof lifted on 3 sides allowing maximum light from north and east

Design Intent

The fast paced market starts as early as 5.00 am in the morning and goes on till 10.00-11.00 in the night. In between 2.00-6.00 the market slows down a little. The inside market gets as quite as it ever could be. The owners and workers during this time take a nap in their small nukkad, chat around tea is served to everyone, pending meetings are held. Its as if the market takes a break.
The outside market also receives less public uses this time to re-stock, packing up, setting up for the evening bazaar contrary of the inside they never seem to catch a break. 
I want to look at the market not as this high paced competition but something to look around, slowing down a bit, understanding what the market really is.

Design Plans

Ground Floor Plan

Plan zoomed in at A

plan render jpg.jpg

A

B

C

plan render fish market.png

Plan zoomed in at B

plan render decoration item.png

Plan zoomed in at C

plan render sabzi.png

Design Sections

final render please it is-min.png

Design Diagrams

ezgif.com-gif-maker (2).gif
ezgif.com-gif-maker (4).gif
ezgif.com-gif-maker (3).gif

Pathways across the market

ezgif.com-gif-maker (5).gif

Modulating plinths

kala admi 2_page-0001_edited.jpg
kala admi_page-0001.jpg

Walls as per the vendors needs

roof example.png

Incremental Roof for maximum natural light 

DocScanner Sep 16, 2023 4-22 PM_page-0001.jpg
DocScanner Sep 16, 2023 4-22 PM_page-0003.jpg
DocScanner Sep 16, 2023 4-22 PM_page-0002.jpg

Pathways forming across the market by arrangements of shops and plinths

Design Views

mode; view.png

Design Model

Physical Model 1:200

Physical Model 1:50

ezgif.com-gif-maker (6).gif

Other works from this studio can be accessed here.

bottom of page